Fill out the form below for all buildings/exterior work and click submit, Stop By the office To Sign the form along with the applicable fees.

Application for Architectural approval

house, architecture, front yard-1836070.jpg

This application is being submitted for approval from the Tink-Wig Mountain Lake Forest Property Owners Association (TWPOA) Architectural Committee with final approval by the Board of Directors.

Application for Architectural Approval

Type of Construction(required)

Type of Improvement(required)

Trees to be Removed(required)

TWPOA Building Permit Checklist

Check off completed(required)

Design Plot Guidelines

Design guidelines and plot design extracted from the requirements outlined in the TWPOA Covenants, By-Laws, Rules, and Regulations.

Plot Plan: Must indicate the following:

  • Dwelling or clearing location with respect to lot lines
  • Trees to be removed
  • Well with respect to lot lines and Septic
  • Septic with respect to lot lines
  • Septic, if applicable, with respect to watercourses and/or Tink Wig Lake Septic (Individual Sewage disposal system or seepage pit draining field);
  • Front/Rear/Side Yards – 10 feet.
  • 50 feet from any watercourse (Brook, Stream, etc.)
  • If the lot has Tink Wig Lake frontage, then the additional requirement of the Septic is that it not be within 200 feet of the Tink Wig Lake. Dwelling Location:
  • Front yard 50 feet minimum
  • Side yard 15 feet minimum
  • Rear yard 25 feet minimum Tree Removal
  • No living trees within 35 feet of the Tink Wig Lake waterline may be cut, “downed” or removed.
  • No more than 50% of the lot can be cleared of trees
  • Dead or diseased trees may be removed without a permit
  • If no trees are removed, the tree removal form is not required
  • If a tree endangers a building, the tree removal form is not required The requirements of setback, septic locations, etc. set forth in this application are a restating of requirements in the TWPOA Covenants, By-Laws, and Rules and Regulations and for guidance purposes to insure a complete and proper application. If any conflicts arise the TWPOA Covenants By-Laws, and Rules and Regulations shall override this document.

ADMINISTRATIVE REQUIREMENTS

(check each paragraph)

By checking I agree(required)

Please use the list below to determine what documents are required for each architecture permit type.

  • A tree removal form is not required if no trees are removed. See other notes above – Tree Removal
  • Builder/contractor Insurance is not required if the Builder Contractor is not involved.
  1. Completed TWPOA Application with applicable fee payment to TWPOA
  2. Proof of owner, if required (Deed/Abstract statement)
  3. Proof of Homeowner’s Insurance
  4. Proof of Builder’s/ Contractor’s Insurance
  5. Septic Approval from Lackawaxen Township
  6. Plot Plans as required (structure, septic, well, and setbacks) Hand drawn is acceptable
  7. Elevations of Structure
  8. Zoning/Permit issued from Township
  9. Architectural Plans (if available)
  10. TWPOA Tree Clearing Compliance Form
  11. Application Fee

***This section to be completed by the Management Office******

  • TWPOA Standing: Assessment Current: Yes: _____ No: _____
  • Verified by Tink Wig Office on ____/____/____ Verified by ______________________
  • Fee Paid ______________ on ___/____/_____ Collected by _____________________
  • Documentation Complete on ____/____/_____ Verified by ______________________
  • Architecture Board Approved on _____/_____/______
  • Board Approved on _____/_____/______ Verified by _________________________